Architect, How to choose a builder | 7 rules list:
Most loft conversions do not require planning permission.
There are several exceptions: Flats, some new houses, properties within conservation areas and all listed buildings.
Most of the lofts will fall under Permitted Development.
1. Initial contact
2. Initial home visit, measurements, initial discussion
3. Free project and quotation
4. Quick, clean and professional construction services
5. Final inspection and Delivery
6. Long time warranty
A loft conversion / loft extension process typically takes between 5 and 8 weeks, depending on the size of the building and complexity of the project.
1. Increase property value - add up to 20% to the value of your property!
2. Increase living space
3. Avoid moving inconveniences and costs
4. Reduce bills with new hi-tech insulation
Radu was great to work with. Clear from the start, kept to budget even though there were obstacles to overcome and went over and above what was agreed. Would highly recommend. ( Jonathan S. )
Open all 16 testimonialsFantastic service! Honest, professional, prompt, personable and reasonably priced. Thanks, Radu & 112Building! ( Keith, J. )
Open all 16 testimonialsA superb job, done on time and on budget. These guys work to a very high standard, and are careful with noise, dust and rubbish. Highly recommended for: plumbing, CH, wiring, plastering, flooring including sanding/staining/sealing antique floor; carpentry including door hanging, skirtings, archtraves; fitting new kitchen , tiling, decorating . I have subsequently used them on a 2nd job and would use them again without hesitation ( Robert D. )
Open all 16 testimonials